Thursday, August 21, 2014

Premature Failure of U.S. Spent Nuclear Fuel Storage Canisters

In a nutshell all we are saying is that this process should be slowed down to ensure the best possible choice of dry cask canisters is made, spend the money wisely “once” to avert another steam generator type disaster and ensure the safety of California’s future. Gene Stone &  Donna Gilmore.

Premature Failure of U.S. Spent Nuclear Fuel Storage Canisters
The California Public Utility Commission (CPUC) should delay funding the new San Onofre dry cask storage system until Southern California Edison provides written substantiation that the major problems identified below are resolved. 
San Onofre’s Chief Nuclear Officer, Tom Palmisano, told the California Senate Energy, Utilities and Communications Committee on August 12th that Edison plans to decide in August or September on a dry cask system vendor. The dry casks systems Edison is considering may fail within 30 years or possibly sooner, based on information provided by Nuclear Regulatory Commission (NRC) technical staff. And there is no technology to adequately inspect canisters and no system in place to mitigate a failed canister.
Edison created an artificial date of June 2019 to have all the spent fuel assemblies loaded into canisters. We don’t need to rush into another “steam generator” like boondoggle.  Edison’s Tom Palmisano told the California Senate Energy, Utilities and Communication Committee on August 12th that issues regarding high burnup fuel and dry cask storage have been addressed. However, these issues have not been resolved.
Canisters may need to be replaced within 30-42 years or sooner. 
Recent information provided by the NRC technical staff indicates dry storage canisters may need to be replaced within 30-42 years or sooner, due to stress corrosion cracking of the thin (1/2 to 5/8 inch) stainless steel canisters (due to our coastal environment). Similar stainless steel materials at nuclear plants have failed within 16 to 33 years.  The concrete overpacks also have aging issues that are accelerated in coastal environments.                                          sanonofrecaskloadingintostoragebunker
Southern California Edison has budgeted $400 million dollars for the dry storage system. As Commissioner Florio stated after the recent CPUC meeting in Costa Mesa, “We don’t want to have to buy these again.”
No remediation plan to repair or replace failed canisters.
The NRC stated that if one of the canisters becomes defective (e.g. 75% through-wall stress corrosion cracks), there is no way to repair or replace the canister; especially if the spent fuel storage and transfer pools are demolished, as Edison plans to do. And before a canister can be transported (inside a transport cask), the canister must not have cracks.
No technology to adequately inspect canisters for stress corrosion cracking.
The NRC states technology does not exist to adequately inspect steel canisters for stress corrosion cracks or to measure how or when the cracks will go through the wall of the canister. They plan to allow the nuclear industry 5 years to try to develop technology. And then they only plan to require inspection of one canister at each nuclear plant.  
No license renewals until aging management issued addressed.
The NRC is in the process of developing an aging management plan due to the new requirement that dry storage systems need to last 100 to 300+ years. They are delaying license renewals until unresolved aging management issues can be addressed. However, they plan to allow the NUHOMS 32PTH2 canister that Edison may procure to be included in an existing license. The NRC is evaluating how long dry storage systems will last. Previously, they only needed to last 20+ years with the assumption there would be a permanent repository.
No canisters approved for high burnup fuel for more than the initial 20 years.
The NRC has not extended licenses past the initial 20 years for storage of high burnup fuel (>45GWd/MTU) due to unknowns about high burnup fuel in storage and transport. This fuel is over twice as radioactive and hotter than lower burnup fuel.  The NRC has allowed nuclear plants to burn fuel longer, without the research to show that it is safe in storage and transport. The protective fuel cladding can become brittle and crack; resulting is higher risk for radiation exposure, if the canisters fail.
NUHOMS dry canister license certification expires in less than nine years.
The NUHOMS DSC-32PTH2 canisters that Edison wants to procure are not yet licensed by the NRC. If approved, the license will expire in less than nine years (February 5, 2023), since Areva-TN decided to avoid a new license certification and include it in their existing license for the DSC-24PT series, which has a different design.
New design of the NUMHOMS DSC-32PTH2 eliminates failed fuel cans.  
Unlike the existing 24 fuel assembly canisters, the new 32 fuel assembly canisters have no provision for Failed Fuel Cans. This means damaged fuel assemblies (of which San Onofre has many) cannot be used in the DSC-32PTH2 canisters. The NRC and DOE require fuel assemblies to be retrievable so they can be transferred to other containers. The Failed Fuel Cans met this requirement.
Background
On July 14th, 15th and August 5th the NRC had public meetings to address aging management issues with dry cask storage system. Their goal is to require an aging management plan before relicensing or issuing new licenses, now that the NRC knows on-site or interim dry cask storage will be needed for up to 300 years or more. The NRC stated the earliest date for a permanent repository is 2048 and that is optimistic. They are researching on-site and interim dry cask storage requirements for 40,100, 150 and 300+ years. No NRC canisters are certified for extended storage or for geological repository storage. Canister licenses for the more dangerous and unstable high burnup (>45GWd/MTU) spent fuel have not been renewed for more than the initial 20 year license, even for expired licenses. And the NRC’s Bob Einziger states there are still transportation problems with high burnup fuel. NRC staff plan to have a draft for public comment regarding dry cask storage relicensing by the end of 2014, according to Mark Lombard, Director, Division of Spent Fuel Storage and Transportation. However, this will not address our current issues.
Stainless Steel Dry Canister Problems
Darrell Dunn, an NRC materials engineer, stated stainless steel dry storage canisters are vulnerable to failure within about 25 – 42 years. If any of the fuel cladding in the canister fails, there is no protective barrier and we could have a serious radiation release. The NRC said they have no current mitigation plan for that consequence.  They suggested we MIGHT be able to put the fuel back in the spent fuel pool.  However, Edison plans to destroy the spent fuel and transfer pools. And there is no technology to repair the canisters. The NRC said they HOPE there will be a solution for mitigation in the future. Even an NRC May 2nd High Burnup Fuel letter admits there are mitigation problems.
No Inspections of Stainless Steel Canisters
To make matters worse, these stainless steel canisters are not inspected after they are loaded into the unsealed concrete overpacks (Areva NUHOMS) or concrete casks (Holtec and NAC Magnastor).  The NRC proposed having each nuclear plant inspect the outside of only ONE stainless steel canister before they receive a license renewal and then do that once every 5 years.  The industry balked at having to even check one canister at every plant. The problem with the stainless steel canisters is they do not protect against gamma rays; so it’s not a simple task to remove a canister from the concrete overpack/cask to examine the exterior for corrosion or other degradation. And since welded canisters do not have monitoring for helium leaks, we may not have any warning of an impending radiation release. 
Concrete Overpack Corrosion Problems
Darrell Dunn discussed serious corrosion problems with the concrete overpacks/casks, especially in coastal environments.   
Ductile Cast Iron Casks may be a better solution
Asked if San Onofre would be better off using ductile cast iron casks like the CASTOR, due to our coastal environment, Aladar (Al) Csontos, NRC Branch Chief in the Division of Spent Fuel Storage and Transportation (SFST), said that might be a better option near the ocean. Casks, such as CASTOR, may eventually have aging issues with bolts and seals. The CASTOR has double sealed lids, so even if one fails, we’ll still have a sealed canister. And Edison would be able to easily monitor for cask material degradation with all the casks.
The NRC licensed the CASTOR V/21 ductile cast iron cask years ago and the cask is still in use. In fact, a CASTOR V/21 was used to prove low burnup fuel is safe to store for over 15 years. However, none of the current U.S. cask designs have been tested even though they use a different storage technology.  The U.S. industry chose a different technology (stainless steel/concrete overpack/cask) mainly due to the cost of ductile cast iron at the time and with the assumption that the canisters would only be needed until Yucca Mountain opened. The CASTOR V/21 was considered the “Cadillac” of the industry and the CASTOR line is still very popular in other parts of the world for BOTH storage and transport (including high burnup fuel). The CASTOR canisters have multiple certifications for quality manufacturing, unlike the U.S. stainless steel canisters that are allowed exceptions to ASME and other standards. Material prices for stainless and cast iron have changed, so the price point should be lower.
The CASTOR has pressurized lid monitoring to detect helium leaks and temperature changes. The welded U.S. canisters do not have this capability, but the NRC and Department of Energy (DOE) state this is a high priority issue to resolve.
The inside of the CASTOR cask, including the sealing surface, has a nickel coating for corrosion protection. On the outside, the cask is protected by an epoxy resin coating in the fin area and nickel coating elsewhere.  And unlike the U.S. stainless steel canisters, it does not have stress corrosion cracking issues and does not require a concrete overpack/cask.
The original CASTOR V/21 is almost 15″ thick as opposed to the 1/2″ to 5/8″ stainless steel canisters.  The newer model CASTOR V/19 is almost 20″ thick. There are other ductile cast iron canister brands that are used in other countries. However, the U.S. emphasis on cost rather than longer term safety discourages competition from better quality casks vendors. With new U.S. needs for longer term onsite and interim dry cask storage, this should change.
Forged Steel Casks (AREVA TN Series)
Areva makes thick walled forged steel casks (TN series), which were approved for limited use years ago by the NRC. The TN cask is much thicker than the stainless steel canisters and doesn’t require a cement overpack/cask.  Its specifications are not as robust as the CASTOR, but better than the Areva NUHOMS system that Edison may procure.  Fukushima Daiichi and Germany use some TN casks. Germany mainly uses the CASTOR casks. 
Enclose Casks in Buildings
Both Japan and Germany enclose their casks in buildings for protection from the environment and other external forces. This is something Edison should consider.
Action Needed
No dry cask solution is even close to perfect, but we need to buy ourselves as much time as possible. Given the issues with stress corrosion cracking, concrete degradation, lack of monitoring, and lack of external inspection of stainless steel canisters, we can do better. Spent fuel pools are dangerous. However, the spent fuel needs to cool in the pools for a number of years, so we have time to do a better job selecting a dry cask storage system. Edison’s artificial deadline of June 2019 to have all canisters loaded should not be the driving factor for the future of California.
The NRC does not proactively research dry storage system designs. They only respond to vendor requests for licensing. Vendors will only do this if they think they have a customer lined up for their product. California needs to be that customer. 
Edison should reopen the bidding to include vendors with other cask technology. Edison’s Community Engagement Panel (CEP) had a presentation from Areva, but from no other dry cask storage vendors. Edison only solicited bids from three canister system manufacturers who all have the problems mentioned in this document. Edison requested the NRC approve the NUHOMS 32PTH2 design – it was not licensed when they decided to use it. That license amendment (Docket No. 72-1029, Certificate of Compliance No. 1029 Amendment No. 3) may be approved in August.  However, the CPUC should not approve funding for this canister system.
Edison has not shared with us the documents they used to solicit bids (Request for Proposal), so we have no idea what the requirements are in that bid package.  That would be useful information and the public should have access to this information.
If you have questions about sources for any information, contact Donna Gilmore. There are also detailed references on the SanOnofreSafety.org website.  A link to the NRC July and August presentations as well as other documents discussed here are on the following pages.
Donna Gilmore                                            
SanOnofreSafety.org                                  
949-204-7794, dgilmore@cox.net 
Gene Stone
Residents Organized for a Safe Environment (ROSE)                              
Member, SONGS Community Engagement Panel
949-233-7724, genston@sbcglobal.net
References
High Burnup Fuel
High Burnup Nuclear Fuel −Pushing the Safety Envelope, M. Resnikoff, D. Gilmore, Jan 2014  http://sanonofresafety.files.wordpress.com/2014/01/hbffactsheet01-09-2014.pdf
Letter from Chairman Macfarlane regarding high burnup fuel, May 2, 2014http://sanonofresafety.files.wordpress.com/2013/06/05-02-14-ltr-to-priscilla-star-fm-chairman-macfarlane.pdf
Response from Donna Gilmore to NRC regarding May 2, 2014 request for NRC high burnup fuel technical basis, June 25, 2014
NRC Presentations
NRC Meeting to Obtain Stakeholder Input on Potential Changes to Guidance for Renewal of Spent Fuel Dry Cask Storage System Licenses and Certificates of Compliance, July 14th/15th, 2014 (includes slide presentations)
Chloride-Induced Stress Corrosion Cracking Tests and Example Aging Management Program, Darrell S. Dunn, NRC/NMSS/SFST, Public Meeting with NEI on Chloride Induced Stress Corrosion Cracking Regulatory Issue Resolution Protocol, August 5, 2014
CASTOR Dry Casks (Ductile cast iron cask technology)
CASTOR V/21 NRC Certificate of Compliance and Safety Analysis Report, August 17, 1990   http://pbadupws.nrc.gov/docs/ML0330/ML033020117.pdf
CASTOR brochure (includes the CASTOR V/19 and other ductile cast iron casks).
GNS’ [CASTOR] experience in the long-term storage at dry interim storage facilities in Ahaus and Gorleben, IAEA Vienna, May 20, 2014  http://bit.ly/1jUSNOZ
Spent Fuel Storage and Transportation Experience, Idaho National Engineering Laboratory (GNS Castor V/21, Transnuclear TN-24P, Westinghouse MC-10, NAC S-100-C), 1987
BAM test results for CASTOR transport containers
Fracture Mechanics Based Design for Radioactive Material Transport Packagings, Historical Review, Sandia SAND98-0764 UC-804, April 1998http://www.osti.gov/scitech/servlets/purl/654001
GNS CASTOR Presentation, June 09-11, 2010, Varna, Bulgaria (slide 18: CASTOR V/19, V52)
Areva TN Series Casks (forged steel cask technology)
TN-24 NRC Certificate of Compliance and Safety Analysis Report, November 4, 1993
AREVA Innovation in the Design of the Used Fuel Storage System, CRIEPI Tokyo, November 15-17, 2010 (includes information on TN 24 casks)
AREVA Dual Purpose Casks in Operation, AREVA TN Experience, Vienna, May 19-21, 2014 http://bit.ly/1l9xO5R
NUHOMS 32PTH2 and San Onofre Decommissioning Plans
NRC Certificate of Compliance for Spent Fuel Storage Casks, COC 1029, Docket 72-1029, Amendment 3, Model No. Standardized Advanced NUHOMS®-24PT1, 24PT4, and 32PTH2,  expires 02/05/2023 (pending NRC approval as of 8/20/2014)
Comments on Direct Rule re List of Approved Storage Casks (79 Fed. Reg. 21,121 (April 15, 2014), Request for Rescission of the Direct Rule, and Request for Publication of a New and Revised Notice of  Proposed Rulemaking, Docket No. 13-0271, Diane Curran, on behalf of 20 environmental organizations and individuals.
February 10, 2012 letter from Edison to NRC: Support for NRC Review of Transnuclear Inc. Application for Amendment 3 to the Standardized Advanced NUHOMS® Certificate of Compliance No. 1029, San Onofre Nuclear Generating Station, Units 2 and 3 and Independent Spent Fuel Storage Installation Docket Nos. 50-36, 50-362 and 72041
Update on Decommissioning Plans, Tom Palmisano, Vice President & Chief Nuclear Officer, August 12, 2014 presentation to CA Senate Energy, Utilities and Communications Committee, Chairman Alex Padilla
Community Engagement Panel Correspondence
High Burnup Fuel and Dry Cask Storage Issues, July 17, 2014 letter to CEP Chairman David Victor from Donna Gilmore, San Onofre Safety
David Victor testimony to NRC Commissioners, July 15, 2014
Additional references at SanOnofreSafety.org

Thursday, July 17, 2014

Recommendations for temporary storage of Nuclear Waste at San Onofre



How long will SONGS be a Nuclear Waste Dump? That answer is unclear at best. But for sure it will be here longer than anyone wants. So it will be safest and cheapest to store it right the first time! SCE and NRC love’s to say the risks are small, but they don’t like to tell us how BIG a nuclear waste accident can be. Anyone remember Chernobyl and Fukushima?

ROSE advocates relocation of nuclear waste as soon as is feasible from the SONGS site to a less populated area and a less earthquake prone area. Temporary or permanent, although a permanent situation is preferred.
1. Storage of dry cask of any type should be within it’s own building to protect them from the salt air at San Onofre as some other countries do .
2. The best canister we have seen is the V-19 German canister. (The V-19 and 21 canisters are an example of a better made product for our site at San Onofre. It was not meant to be a recommendation to buy, just the type of construction method we may want to look at.)
3. There should be a fuel pool with crane on site to mitigate any accident with any of the dry casks.
4. There should be some type of pressure or radiation monitoring of cask in real time which the V-19 canister has.
5. NRC needs to update it’s procedures to include inspections of decommissioned cask storage areas on a regular and timely basis.
6. DOE needs to set a firm date as to when they will takeover SONGS nuclear waste and exactly how they will do that.

Donna Gilmore talking about dry cask storage for San Onofre Nuclear (Waste) Generating Station 

http://www.youtube.com/watch?v=xLr0WR5oSjU

By Gene Stone


Sunday, March 30, 2014

SCE Cited For Major Nuclear Related Safety Violation At San Onofre

Get SCE Out of San Onofre
Background: NRC Spent Fuel Pool Cooling Requirements:

“Each licensee shall develop and implement guidance and strategies intended to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities under the circumstances associated with loss of large areas of the plant due to explosions or fire ….”

The San Onofre spent fuel cooling fire protection plan in the event of a large fire and/or explosion hinges on the expertise and staffing of the on-sight San Onofre Fire Department.

Since the San Onofre Fire Department and Emergency Planning Personnel Staffing was reduced to a skeleton crew without prior approval from the NRC after a full and proper evaluation, the existing fire plan is now outdated and unrealistic in event of a large fire or explosion.

A Spent Fuel Pool Cooling Accident, in case of a large fire or explosion without adequate and demonstrated mitigation measures is a MAJOR Nuclear Safety Concern for all the millions of Southern Californians living within the 10 Mile Emergency Protection Zone.  Remember Fukushima's triple meltdowns occurred because of a failure to keep their reactors cool after the big earth quake and tsunami which occurred on 03/11/11.


Last Friday, the NRC cited SCE, the operator of San Onofre's nuclear power plant for violating NRC rules by failing to get approval before eliminating 39 emergency-response jobs after the plant closed last year.

Historically, NRC Region IV has had the habit of citing Southern California Edison with only low level violations, even if the violations were actually severe violations.  This cozy relationship was a contributing factor in the radioactive leak that resulted in the early decommissioning of San Onofre Units 2 & 3 and the loss of billions of dollars to SoCal ratepayers that could have been prevented, if the NRC had enforced the Federal Regulations as written.  This type of safety enforcement is not good for Californians or the NRC.  Now a serious review/investigation and proper action/fines are required by the NRC and its Commissioners, to assure Nuclear Safety is maintained at San Onofre and all the other US Nuclear Power Plants.

The question the NRC should ask is, "Knowing that the SPENT FUEL POOLS MUST STILL BE KEPT COOL 24/7 no matter what, if a major earth quake occurred tonight, would San Onofre Fire Dept.'s skeleton crew be able to guarantee US that they could prevent a nuclear accident from occurring, especially since the 39 emergency-response positions that were illegally eliminated, probably cost ratepayers much less than even one still employed highly paid nuclear manager who would be home sleeping?  

The question that the CPUC should ask is, "If SEC is really interested in safety as they keep telling us, what is the reasonableness of continually cutting corners on those that actually insure our safety, while at the same time retaining other highly paid nuclear Staff?
Enhanced by Zemanta

Thursday, July 4, 2013

Germany's Clean Energy Push: What Can the World Learn

Can Germany Lead California To Energy Freedom?

Germany's Clean Energy Push: What Can the World Learn

Register Now
Live, Free Webinar*

Tue, Jul 9, 2013 11:00 AM - 12:00 PM EDT

Known as the Energiewende, or "energy transition", Germany's campaign to move to renewable power is ambitious, massively popular at home, and by many accounts, quite successful. With 25% of Germany's electricity currently being sourced from solar, wind, and biomass generation and a target of 80% renewable by 2050 in place, the German energy economy is worth watching.

What can the rest of Europe, the U.S., and other nations learn from one wealthy nation's aggressive clean energy push? Will Germany succeed in meeting its goals? Which are its biggest obstacles? And perhaps most importantly, can other nations replicate Germany's most positive achievements? Join us as we ask:

- What distinguishes Germany in terms of economics or political will that has made energiewende possible? Which nations have similar qualities?
- What has been Germany's most successful strategy in cleaning up its energy mix?
- Is the decision to eliminate nuclear power after the Fukushima event consistent with Germany's goals?
- What could prevent other nations from adopting similar strategies?

Featuring:

- Rainer Baake:
Director of Agora-Energiewende, former Deputy Minister of the German Federal Environmental Ministry

- Dr. Sören Buttkereit:
Vice President of regulatory strategies for Siemens Energy, focused on market design in the power sector and the adaptations required for a successful transition towards systems with a higher share of (intermittent) renewables.

- Stephanie Wang
Regulatory Policy Director for the Clean Coalition, a nonprofit working to encourage a modern energy system of smaller-scale, efficient, renewable energy projects.

- Jesse Jenkins, Moderator:
MIT Energy Initiative Energy Fellow and Community Manager at The Energy Collective, former Director of Energy and Climate Policy at the Breakthrough Instituteenergiewende possible? Which nations have similar qualities?

What has been Germany's most successful strategy in cleaning up its energy mix?

Is the decision to eliminate nuclear power after the Fukushima event consistent with Germany's goals?

What could prevent other nations from adopting similar strategies?


  * https://attendee.gotowebinar.com/register/1354509616397857280?source=tec_blast1&inf_contact_key=bb8ec0d2ea0a237eb8db11a840ff3a5b2b1aa31b33e32499f4be8f4cc0c4aaa2


Saturday, June 22, 2013

The $742 Million Question:

The $742 Million Question

Who should pay for the extra Decommissioning money, not yet collected?

Since the operators of San Onofre made the financial decision to shut it down prematurely, all decommissioning fees not already collected for Units 2 and 3 by 01/31/12, should be paid by the operators of San Onofre, not ratepayers!


Also the California Public Utilities Commission should required SCE put the Decommissioning of San Onofre out for public bid, instead of just giving the mega billion dollar job to SCE. California ratepayers cannot afford a sole source bid when so many International Companies with nuclear expertise are looking for work.


A public bidding process will save California ratepayers huge amounts of money, money which should not end up in SCE's shareholders pockets. This single project has the potential to jump start our economy, we cannot allow the CPUC to short circuit our states bidding process by not putting this job out for bid!


   Decommissioning Costs as of 1/1/2012
SONGS 1     $ Million
SONGS 2 $ Million
SONGS 3 $ Million
  Radiological Costs
183.3
1,273.6
1,262.4
            Site Restoration
10.7
417.0
535.5
  Fuel Storage (Including ISFSI Decommissioning)
11.2
385.3
368.3
  Estimated Total Budget 2009 (See Note 2)
N/A
1,791
1,868
      Total Collected 10/31/12  (See Note 1)
291.4
1,638.1
1,865.4
    Total Projection 1/1/2012
205.2
2,079.5
2,166.2
Estimated Loss Due To Poor RSG Design/Operation
           86.2   Previously   Overbilled
        441.4           Shortfall
        300.8              Shortfall

  1. SCE  Letter to NRC (2012) https://docs.google.com/folder/d/0BweZ3c0aFXcFZGpvRlo4aXJCT2s/edit?docId=0BweZ3c0aFXcFNHF2ZDVncy1GM0U
  2. SCE Testimony to CPUC (2009) https://docs.google.com/folder/d/0BweZ3c0aFXcFZGpvRlo4aXJCT2s/edit?docId=0BweZ3c0aFXcFYlhqWHVQbEYyVkU
Background

The purpose of the Nuclear Decommissioning Trust Funds is to mitigate for ratepayers the high cost of decommissioning nuclear power plants at the end of their lives by collecting reasonable fees over a long period of time. The CPUC directs the investor owned utilities to collect a regular Decommissioning fee on customers’ monthly electric bills for Edison and SDG&E’s San Onofre Plant (30 years old) and PG&E’s Diablo Canyon Plant (28 years old). The expected life of a nuclear power plant is 40 years.

$5.2 billion of ratepayer collection is currently invested with the Trust Funds.

At current liquidation value, combined Decommissioning Trust Funds are ~90% funded. The Trust Funds are currently invested in equities (60%) and investment grade fixed income securities (40%). D.87-05-062 established nuclear decommissioning trusts for funding future decommissioning of the utilities’ nuclear units. Each nuclear plant has decommissioning trusts and a committee that oversees the trust fund; Under Public Utilities Code § 8326, SCE is required to provide a decommissioning cost estimate that includes, among other things,

an estimate of the costs of decommissioning, and

a description of changes in regulation, technology, and economics affecting the estimate of costs.

As SCE explains, and as TURN’s witness Lacy acknowledges, the costs to decommission a nuclear facility include the costs to

store the spent fuel onsite or offsite until it is removed by the DOE;

remove residual radioactivity from the site, including from the spent fuel storage facility, to levels required to terminate the NRC license and to release the site for unrestricted use; and

remove non-radiological structures, systems, and components as required to leave the site in a safe condition, or as otherwise mandated by the state or the site owner.

The Utilities project that they will perform the actual decommissioning in three phases.

During Phase I, the Utilities will decontaminate, dismantle, and dispose of the units and the site common facilities. The Utilities will also continue to maintain the integrity and safety of the spent fuel while it remains on the SONGS site. The Utilities will maintain spent fuel in wet storage in spent fuel pools until it can be safely transferred to the SONGS 2 & 3 Independent Spent Fuel Storage Installation (ISFSI) or removed from the site by the U.S. Department of Energy (DOE). To safely store fuel in wet storage, the Utilities must maintain each plant system required for spent fuel pool operation until the fuel is removed. The Utilities will drain, de-energize, and secure all other plant systems. After the SONGS 2 & 3 spent fuel pools are empty, the Utilities will decommission the pools and their associated support structures and systems. The Utilities assume that by the time the SONGS 2 & 3 fuel has cooled sufficiently to be removed from the spent fuel pools, the DOE will have removed enough SONGS 2 & 3 fuel from the SONGS site that it will not be necessary to further expand the ISFSI pads or to construct additional Advanced Horizontal Storage Modules (ASHM) to accommodate that fuel.

During Phase II, the Utilities will monitor the ISFSI until the DOE removes the last spent fuel from the site, which is assumed to occur by 2051 based on studies developed from the DOE Acceptance Priority Ranking & Annual Capacity Report (DOE/RW-0567), dated July 2004.

During Phase III, the Utilities will dismantle and dispose of the ISFSI, all remaining site common facilities, and the remaining structural foundations; terminate the NRC licenses; and complete the final site restoration work.

Note: The Utilities do not own the site upon which the SONGS facility is located. Instead, they are authorized to use the site under several lease contracts and grants of easement from the U.S. Department of the Navy and the California State Lands Commission. To terminate these agreements, the Utilities are required to remove all improvements they installed or constructed on the site, except as agreed by the lessors/grantors, return the site to a condition satisfactory to the grantor, and return the site to the lessors/grantors.

Thursday, March 14, 2013

San Onofre Unit 2 Retainer Bars Could Cause Massive ☢ Leakage



In an accident like a main steam line break at San Onofre, the badly designed retainers bars in Unit 2 could actually make things much worse by causing more damage to any of the 9,727 already fatigued tubes in each of its steam generators which could lead to additional leakage of highly radioactive reactor core coolant and/or cause a nuclear incident or worse a nuclear accident like Fukushima!


Radioactive Leaks and ruptures can happen without notice:





Allegation/Violations

The NRC has decided in AIT follow-up report dated 11/09/2012, “Item 3. “(Closed) Unresolved Item 05000362/2012007-03, ‘Evaluation of Retainer Bars Vibration during the Original Design of the Replacement Steam Generators” as a non-cited violation in accordance with Section 2.3.2 of the NRC’s Enforcement Policy.”  However, as shown below, SCE/MHI’s failure to verify the adequacy of the retainer bar design as required by SCE/MHI’s procedures have resulted in plugging of several hundred tubes in the brand new replacement generators. This has resulted in these violations:

1. Failure to meet NRC Chairman Standards on Nuclear Safety by SCE,
2. Failure to meet Senator Boxer’s Committee on Environment and Public Works
(EPW) Standards on Nuclear Safety by SCE,
3. Failure to enforce SCE Edison Contract Document instructions to MHI by SCE,
4. Failure to meet SONGS Technical Specifications by SCE,
5. Failure to meet general design criteria (GDC) in Appendix A, “General Design
Criteria for Nuclear Power Plants,” to 10 CFR Part 50, “Domestic
Licensing of Production and Utilization Facilities GDC 14, “Reactor
Coolant Pressure Boundary” by SCE/MHI,
6. Failure to demonstrate that Unit 2 retainer bars will maintain tube bundle
geometry at 70% power due to fluid elastic instability during a main line
steam break (MSLB) design basis event, and
7. SCE/MHI took shortcuts by avoiding the 10 CFR 50.90 License Amendment
Process under the false pretense of “like for a like” replacement steam
generator.  SCE added 377 more tubes, increased the average length of the
heated tubes and changed the thermal-hydraulic operation of the RSGs without
proper safety analysis and inadequate 10CFR 50.59 Evaluation.
This intentional action to produce more thermal megawatts out of the
RSGs compromised safety at SONGS Unit 2 due to the failure of 90
percent through wall thickness of a tube by the inadequate design of the
r
etainer bar.

Recommended Actions:

NRC San Onofre Special Panel is requested to resolve the above listed Allegations and/or Violations within 30 days of receipt of this email and prior to granting SCE’s permission to do any restart "testing" of Unit 2. Answer all allegations factually, don't just void them.
 
See Full Document:
Media Alert: San Onofre Retainer Bar Problems